Model detail
Gemini Decision 1
Gemini Decision 1 evaluates typed yes/no, choice and rubric questions over shared multimodal input and returns calibrated probabilities without generating output tokens.
Model specs
- Model ID
-
gemini-decision-1
- Context length
- 262.144K
- Max output
- –
- I/O modalities
- Released
- 2026-11
02
API endpoints
One MixRoute gateway, OpenAI-compatible
-
Gemini
/v1beta/models/{model}:generateContentPOST -
OpenAI-compatible
/v1/chat/completionsPOST
03
Pricing
Flat rate, unit: /1M Tokens
Pricing updated
Input
$0.1000 /1M Tokens
Completion
$0.4000 /1M Tokens
05
Selection summary
Quickly judge whether it fits your workload
What is this model good for?
Decisions
Gemini Decision 1 is Google's decision model for state-and-question decision tasks. It accepts input such as text, image and video, and returns decisions. Its capabilities are broken down in the section just below. Send one state-and-question request with your own options and accumulated state before you wire it in.
What should you check before using it?
262,144 tokens of state and questions
Gemini Decision 1 accepts up to 262,144 tokens of state and questions per request. Size your accumulated state and questions against that window before each request.
Why use it through MixRoute?
Call this model with a MixRoute API key
Use /v1beta/decisions with model ID gemini-decision-1 through MixRoute at https://api.mixroute.ai. Configure a client for this endpoint, then test the integration with a sample request before sending production traffic.
07
Capabilities & compatibility
Unconfirmed capabilities stay "Unknown," no guesses
Vision input
Gemini Decision 1 can process image inputs alongside text.
image_url content part alongside text messages.
08
Token cost estimator
Live estimate from this page's pricing, not an actual bill
This model has no cache-read price; caching is not counted
More from Google
All Google modelsOne endpoint, a testable decision
Test this model and alternate routes with the same request format
Start from a real workload, then let quality, total cost, and failure conditions decide whether to send production traffic.